! FOR SALE DEVELOPED PLOT WITH BUILDING PERMIT IN Łęgi !
LOCATION DESCRIPTION:
The plot is located in the village of Łęgi, 14 km from Szczecin , in the Dobra (Szczecińska) commune, near the Polish-German border. Access to the borders of Szczecin at Wiedze takes about 20 minutes.
In close proximity to the plot there is a public transport stop for the day line No. 223 and the night line No. 535, Bike & Ride type. Next to the transfer center there is a community center with a playground and a gym.
A bicycle path runs through the village, which is part of the bicycle trail connecting the Dobra Commune with border towns on the German side of the border. Ultimately, the bicycle trail will allow you to bike to the center of Szczecin
The picturesque location of the village in the vicinity of the Świdwie nature reserve, in the bird protection zone “Jezioro Świdwie”, provides unlimited opportunities for communing with nature. You can observe numerous species of fauna here, especially birds. Swimming in the lake is a great way to relax and regenerate.
In the village on the hill there are the remains of a Slavic stronghold dating back to the early Middle Ages (11th–12th centuries).
PLOT DESCRIPTION:
The plot has an area of 3,030 m2, is flat and trapezoidal. It is covered with grassy vegetation. There are no buildings on the plots in the immediate vicinity on the north, south and east sides. The plot on the opposite side of the road is built-up.
The plot is directly adjacent to municipal road No. 85, ul. On Świdwie.
The plot is armed. A cable-measuring joint was made. Electricity and gas on the plot, sanitary sewage system KS200 and telecommunications network on the way, water supply network WOA110 on the other side of the street.
CONNECTION CONDITIONS AGREED WITH UTILITY SUPPLIERS!
TRUE! Permission to connect to the sanitary sewage system was obtained for the plot. This is no longer possible for new investments.
A geotechnical opinion was prepared for the plot, defining the ground conditions as simple and allowing the implementation of the project.
A medium voltage overhead line runs over the edge of the eastern side of the plot.
BUILDING PERMIT:
The building permit was granted for a detached residential building with external installations: water, gas, electricity, sanitary sewage system, storm sewage system with a retention tank.
The construction project includes land development and the design of a single-family, detached, two-story residential building covered with a symmetrical gable roof and a garage.
BUILDING PERMIT + Utilities + GOOD LOCATION + NATURAL AND HOSTORICAL ATTRACTIONS + PUBLIC TRANSPORT + BIKE TRAILS + PEACE + SPACE = DREAMS COME TRUE 🙂
I invite you to the presentation